Tuesday, November 10, 2009

Preparing Trenches


Mr. Williams is in the excavator preparing to dig trenches for the footings of the foundation to go in.  He had planned to pour the concrete tomorrow, but, alas, it will be Veterans' Day and no inspector is available to review the work first. So, now that is the plan for Thursday.

When you see the earth moved, and you realize that exact trench is there because of where you drew a line on your free-downloaded computer program, a bit of panic sets in! Yikes! I hope this looks as good in real life as it seems to on the computer.

This next photo is taken from the corner of Peachtree Ct. and Eddie and Park Rd.   It is my intention to take updated photos from this location, to show the progress as the house goes up.  The door on the side of the house used to be inside the breezeway.  This side of the house has probably never been exposed to the outside world!  Also, this photo shows the lack of the two silver maples which were on each side of the driveway.





2 comments:

  1. Jenn, I am loving the pics. I can't get over the door that leads into the kitchen just being right smack on the outside !!

    ok, so that brick wall has never seen the light of day before? I thought the "playroom" was built AFTER the rest of the house was erected. I guess I thought that Allen added the playroom and garage later on after the rest of the house.

    pearl and gang

    ReplyDelete
  2. It is really hard to tell the timing of the breezeway. It could have come so close to the building of the house, like immediately after, we're not sure. Some of the brickwork indicates that they were done nearl the same time. The roofs of the house and breezeway were one structure, and needed to be sawn in two with a hand saw just prior to the demolition. The garage, however, had its own internal structure and had an exterior wall that was behind Allen's paneling.

    ReplyDelete