Sunday, December 27, 2009

Week number EIGHT to begin

Well, we seem to be in the home stretch. It is amazing how quickly this project has gone. From what we can tell, it is just about time for the drywallers to cover all the interior studs, then tape and mud them. Then, the electricians and plumbers come back to put in their finishing touches. On the outside, the siding is well on its way. Then, I suppose there will be some sort of concrete sidewalks or such done around the back door. Also, the drilling and final hook-up for the geothermal heating/cooling has yet to happen. Whew! What a lot of work these fine craftsmen have done on this home.



Then, it's our turn! We plan to paint the interior and do some trim work. We will just take this at whatever pace we can maintain. Please keep praying for us, that we will make wise decisions regarding the use of our resources- time, money, energy- and that we will keep the hearts of the children all throughout the work.



Here is a current photo, roughly from the corner of Eddie and Park Rd. and Peachtree Ct. (taken from inside the car, because it's been so cold!)

Monday, December 21, 2009

Siding!!!!

Wow! The siding looks terrific. I am so pleased, and I think it will tie the two parts of the house together nicely. This first picture is the "Siding Guy". Yes, we do know the worker's real names, but didn't think we should post all that on the web. He is a nice young man, who seemed to enjoy his job. He took time to show Conner and Peter how his metal-fabricating machine worked.

Here is a shot of the back of the house. Notice the white trim line halfway up the addition. This will continue across to the existing house as the guttering and fascia. The idea is to change the proportions of the two structures. Instead of a little box and a big box... we hope the eye sees one long first floor with a second story on part of it. I think this visual trick is working. It will be easier to tell when it is all covered. Here is a view showing the wood frame addition, the existing brick house, and the new siding going on. Oh, one last thing, the color is exactly what we hoped for... nothing to draw attention to itself, but to blend into the shady landscaping. But not too boring, with the crisp white trim.

Friday, December 18, 2009

Trucks

Here we are at the end of the work week, and there are men from so many trades all going at it simultaneously. We have on-site electricians, plumbers, HVAC, carpenters, delivery men, siding guys, and well drillers (for geothermal holes). Here is a smattering of photos to illustrate this fact- through TRUCKS!

Our siding was delivered today!!!

The truck says it all:


This is a carpenter's truck. It serves as one LARGE tool box.

This is the well-drilling rig. Next week I will show it to you in action. Note: all those long pipes on top will be screwed together and lowered into the ground, deeper and deeper as the end tip drills into the earth.
(As it was lunchtime, some of the other trucks were gone when I took these photos.)

Tuesday, December 15, 2009

Now *that's* a drill!

Look at the length of this drill! It is used to drill holes in the studs for electrical wires to be ran through. The worker has good leverage, and the end of the drill is angled to get between the studs and still make a straight hole.
Here is the wiring that has been ran so far above our heads on the first floor. Notice that it is going through holes that were drilled through the floor joists. That is a lot of drilling, but much easier now than after the house is finished.




The children and I have spent 10 hours yesterday and today going from place to place "shopping" for bathroom fixtures (toilets, faucets, vanities, sinks) and lighting. By "shopping" I mean that we go to the stores and take a gazillion photos of what we think Daddy might like, along with the price tags. Then at night we sort through them all, trying to come to some decisions. We are getting down to the wire to make these decisions. After the plumbing and electrical are roughed in, then come the drywallers. When they finish, the plumbers and electricians come back to put in all the stuff we've picked out. It is our responsibility to get all that stuff bought and to the job site. This is because there is so much variability on costs and personal taste for those types of items. We are really trying to reign in the expenses in these areas, and yet have something that comes together nicely. It's funny, but the items that seem "standard" can really be expensive right now. It think it's because there is a trend toward classic looks right now. Anyway, we ended up choosing to go with pedestal sinks for the upstairs bathroom. Since we are putting in two sinks, the corresponding furniture cabinet would have been more than we wanted to spend. In the end, I think it will be easier for 4 or 5 people to use the 2 sinks this way, because they can stand around the sides of the sinks, without a countertop between the two.



More rambling thoughts now... please pray for us to make wise decisions here at the end of this process. We have been praying for this all along, but it seems like the decisions are coming fast and furious, and we want to show good stewardship over this gift we have been given.

Saturday, December 12, 2009

The electricians were here, too!

The electricians were working on the second story wiring on Friday! Chad and I met with the lead man on Thursday, to go over our lighting and wiring plan with him. What you can see in this photo is the recessed lighting that will be in the school room. This circuit of recessed lights will be in addition to a regular fixture. We are doing this (a combination of recessed and a ceiling fixture) to ensure that there is plenty of lighting in the three major public areas (school room, living room, dining room).

Here is a shot of an outlet box in one of the bedrooms. It's neat to notice the details of the installation that each of the trades do. Notice that there is drilling (through the 2x4s), stapling of the wire to the studs, extra slack given into the wire (in case changes are made in the future that may take up extra inches of wire), and marking of the location with a sharpie on the 2x4 stud.

In fact, we discovered that not only are the positions written on the studs, but the function of each switch is also noted. In this photo of the bathroom, you can see how there will be a switch for 2 ceiling lights and a switch for the exhaust fan. However, notice what the electrician referred to the fan as---
"Fart Fan" We were cracking up!!!!!!!

Windows, windows everywhere!

What a difference windows make to the look of a place. It seems even more like a home now, than a construction site, though it is still very much that.
Here is one of the boys' bedrooms, the one that faces Grant's Farm. The two windows in front are double hung windows. We used these type on all the front and rear facing windows. On the side, however, is a casement type window. This one cranks open, thus making the opening a large one. This is per code. There are size requirements in Saint Louis County regarding the minimum size of a second way of escape from a bedroom in case of fire (the first way of escape being the door). I think this room has a great view!

This photo shows the back side of the house. On all but the upper left one, you can see 2x4 frames around each window group. These will be covered with white trim, to give what I call a "beefy" look. We are not using shutters, or other ornamentation, so this trim needed to be stronger than it otherwise would have been. Notice that there is also a door installed. All three doors are in now, in fact. (Front, back, and side.) I asked Duncan to pretend to ring the doorbell. Notice the side window which allows us to see who is at the door? This view is visible from the kitchen and living room areas.

Friday, December 11, 2009

Walls up on the first floor

We are confirming it to be true that the more walls go up, the bigger the space becomes. This is because in a large empty room, it is hard to judge accurately the size of the space. When a wall is there, we have a human-sized reference point that helps us to see the space. We can then judge what types of furniture and such will fit in a room and where the "people-sized" spaces are.

Here Duncan is standing in the powder room, otherwise known as the half bath. This is a very small space, but with the walls there, you can see that it is adequately sized for a sink and potty.

Located in the dining room, there will be an alcove specially sized for our piano. Above the piano, there is an opening in the wall 4 feet wide by 3 feet tall. As you stand in the dining room, the room you look into is the one that we're calling the den or guest room. We have this room available for guests to stay in and for t.v. viewing or computer usage. However, we wanted it to be visually connected with the other public areas, thus the wall opening. Here are my two monkeys climbing on the wall framing. I told them to get it out of their systems now, because when that's actually a wall, they won't be climbing through!

By the way, the concrete floors have been covered with a heavy plastic to protect them during the rest of the construction. I can't wait to see them when they are all done!

Thursday, December 10, 2009

Still working in the freezing cold!

Just a quick note to acknowledge that the men are still working away on the house, in spite of the freezing cold weather. It is about 20 degrees here in Saint Louis. If the doors and windows go in today or Friday, that should help the situation immensely. However, right now they are using plastic sheeting to cover the openings. Some of it did not hold up to the 50 mile an hour winds we had yesterday. Also, the men have a heater that keeps the area right around where they are working somewhat warm.

Two of the men were laughing about how Mr. Williams answer to the cold is "Work faster, you'll stay warm!" That sounds just like something he would say. GRIN!

Monday, December 7, 2009

Progress on plumbing and archway

Some progress was made today on the plumbing. These pipes carry waste water away from the upstairs showers and sinks.

If you look on the floorplan drawing from a few days ago, you can see that there is an opening between the new dining room and the existing house's library. To get this opening there, an archway has been cut in what used to be the exterior brick wall of the house. Here is a before picture, you can see the cut lines in the brick on each side.
Here is an after photo, showing the archway. The opening is covered in plastic to keep some of the cold weather out of the existing house.

Thursday, December 3, 2009

Exterior work continuing

You can see in these photos how the bushes that lined the front of the house have been removed. We hope to landscape with plantings that look somewhat softer than those did.

The existing house will be sided the same as the new addition, for a cohesive look. To hang siding on brick, you must first attach strips of wood to the brick. Then the siding attaches to those strips. Also in this photo, you can see how the windows are in the process of being replaced with new thermal windows. The picture window which was in the former living room will be replaced with 3 windows of uniform size. That room will be our library, the windows making a window seat for cozy reading.

Interior concrete floor

We've learned by now that you have to get up early in the morning to see all the work getting done! By the time we got there around noon today, the concrete had already been poured and was mostly troweled smooth. Zoe did catch some of the troweling on camera, and that's what you will be seeing here.

Zoe is filming from the vantage point of inside the original house in the kitchen. She is looking through the existing window, which used to look out to the yard. This will soon be an opening in the wall between the kitchen and the living room.

Notice in the video how the workman is kneeling on boards that he then lifts and places in another position and continues working. The area of the house that is being done here is the mudroom and the doorway that goes to the side of the house (future garage?). You can see that he doesn't get backed into a corner, but instead works his way to an opening that he simply steps out of. At the end of the video you can see an overview of the entire first floor. By the way, the concrete is not its usual color, but is colored tan. We chose this to be a neutral flooring color, similar in tone to what a wood floor would look like.


Wednesday, December 2, 2009

A SECRET PASSAGE!!!

I know I didn't show a drawing of the second story floor plan, so I'll try to describe a bit of it to you. In the front of the house there are two bedrooms for our boys to share. You can see their windows in some of the previous exterior photos. These two rooms each have a closet, and these 2 closets adjoin each other end-to-end. The special thing we came up with as a surprise for the boys was to make a "secret passage" between the closets! A few days ago, one of the carpenters said to me, "What's with the hole in the closet?" I told him what it was, so when Peter and I went upstairs today, the carpenter said, "Hey, Buddy! You're secret passage is in!" I had failed to mention that it was a SURPRISE secret passage. Anyway, they boys all know about it now, and they were THRILLED with the idea! Here is Peter crawling through the secret passage.

Big machine work

Mr. Williams likes to get good use out of his big machines! So when he had the excavator out again to grade the interior gravel, he obliged us by removing several trees. Three of them were out along Eddie and Park Rd. They were best described as scraggly and homely. A professional tree removal service probably would have climbed up, cut down branches, and then either left a stump, or routed it out. However, when you have an excavator, you just knock it over!

The reason the excavator was on-site was to smooth out the gravel that is going to be underneath the concrete floor of the first floor of the addition. Previous to today, all this rock was just piled all in there. The plumbers dug out trenches in it to place their pipes, so all that type of stuff will be underneath the floor. Here is a photo of Peter showing how smoothed out the gravel is.


The light blue area along the perimiter of the room is a foam insulation. This is to help keep the cold from seeping up through the floor so much. The plan is to pour the concrete floor on Thursday and put in the walls on Friday. If all that happens, I'll be sure to show you!