Next, some plastic and gravel was put in place over the existing concrete. This is to provide a moisture barrier and to build up the ground and provide drainage. Here are the children on the gravel pile!
From inside the mudroom, the children had a great view of the work as it was being done. It was neat to see how everything came together.
The concrete truck has arrived! Now for the good part!
As soon as the concrete came down the chute, the men were working to shovel and trowel it into place. The concrete is very rocky, and you wonder as it is being poured just how it will ever look smooth and neat.
Within a few minutes, they have smoothed it once with a wooden board, then with this metal tool:
He uses various trowels and other tools to smooth the concrete and put grooves in it. Also, some swirly patterns are put into place, which you can see here on the flat portion just outside our back door.
And, finally, here it is!!! Everywhere you see gravel currently will one day be grassy yard. Therefore, as you step off of the yard, you will first get to the hexagon-shaped step. Then up two steps and you are at the level of the threshold of the door. Alternatively, if you were to drive up alongside the left of the house, and need wheelchair accessibility, you can use the ramp. It is hard from this photo to tell the heights of all this concrete, but the ramp will one day start at ground level (after more dirt is added) and will lead to the back door.