This is what the footing trenches look like before the concrete is put in. Notice the rebar laying in the trench, which serves to strengthen the concrete once it is poured.
This photo shows Mr. Williams and his employee directing where the concrete gets poured. The trough coming down into the trench is connected to a concrete mixer. Mr. Williams is making sure the river of concrete goes where it is supposed to go. The other man is spreading it down into all the spaces of the trench, for proper filling. 
This is where the main entry of the house will be. We call it the "front door" even though it is on the back side of the house.

Here the wet river of concrete is being smoothed out. What skill it takes to do each aspect of this construction. He made it look so easy.

Here we are the next day with Daddy- walking on the now-dry river of concrete. Linus is inspecting the job!

The family is standing where our new back "front door" will be.



