Sorry for the delay in keeping you posted. The work that was going on the last two weeks was mostly more of the same--- more electrical, more duct work, more carpentry, more siding, etc. We were happy to be seeing it done, but it hasn't made for exciting photos or updates.


To get started, here's an updated photo from the back yard of how the siding is turning out. We are so pleased with it.



This 10th week of work has some new stuff! First, the geothermal ground loops were installed. Here's how it works: *Drill 3 holes into the front yard, 200 feet deep, about 10 feet apart. This involved the drilling rig we being lifted up vertically. In this video you will see the bit (which is a looong metal pipe, threaded on the ends) being attached to the bit already in the ground. Then they proceed to spin it and the rig pushes on the top of it as it drills into the earth. It is pretty slow going. After the length of it gets all the way down, another bit is attached to the top of it, and the process continues. For 200 feet!






Here is a nice shot of the drilling rig. Notice the additional drill bits, as I am calling them, or metal pipes, waiting for their turn to dig down.

This drilling was done on Monday. When we came by today on Thursday, the geothermal ground loops had been inserted into the holes. Then these loops/tubes are connected together, somehow, so there is only two going into the house. A trench was dug from the holes in the yard over to the house, four feet down. The geothermal tubing was then inserted into the house, through the basement wall. This photo shows a man using tar to seal this opening.



And then this man began to cover them up and fill in the hole. He also used a Bobcat, not just a shovel! If you were to see the front yard now, you would see no evidence that the geothermal ground loops are even out there, except for the fact that there are truck and bobcat tracks all across the yard!