Thursday, January 14, 2010

Catching up - GEOTHERMAL!

Sorry for the delay in keeping you posted. The work that was going on the last two weeks was mostly more of the same--- more electrical, more duct work, more carpentry, more siding, etc. We were happy to be seeing it done, but it hasn't made for exciting photos or updates.


To get started, here's an updated photo from the back yard of how the siding is turning out. We are so pleased with it.



This 10th week of work has some new stuff! First, the geothermal ground loops were installed. Here's how it works: *Drill 3 holes into the front yard, 200 feet deep, about 10 feet apart. This involved the drilling rig we being lifted up vertically. In this video you will see the bit (which is a looong metal pipe, threaded on the ends) being attached to the bit already in the ground. Then they proceed to spin it and the rig pushes on the top of it as it drills into the earth. It is pretty slow going. After the length of it gets all the way down, another bit is attached to the top of it, and the process continues. For 200 feet!






Here is a nice shot of the drilling rig. Notice the additional drill bits, as I am calling them, or metal pipes, waiting for their turn to dig down.

This drilling was done on Monday. When we came by today on Thursday, the geothermal ground loops had been inserted into the holes. Then these loops/tubes are connected together, somehow, so there is only two going into the house. A trench was dug from the holes in the yard over to the house, four feet down. The geothermal tubing was then inserted into the house, through the basement wall. This photo shows a man using tar to seal this opening.



And then this man began to cover them up and fill in the hole. He also used a Bobcat, not just a shovel! If you were to see the front yard now, you would see no evidence that the geothermal ground loops are even out there, except for the fact that there are truck and bobcat tracks all across the yard!


Sunday, December 27, 2009

Week number EIGHT to begin

Well, we seem to be in the home stretch. It is amazing how quickly this project has gone. From what we can tell, it is just about time for the drywallers to cover all the interior studs, then tape and mud them. Then, the electricians and plumbers come back to put in their finishing touches. On the outside, the siding is well on its way. Then, I suppose there will be some sort of concrete sidewalks or such done around the back door. Also, the drilling and final hook-up for the geothermal heating/cooling has yet to happen. Whew! What a lot of work these fine craftsmen have done on this home.



Then, it's our turn! We plan to paint the interior and do some trim work. We will just take this at whatever pace we can maintain. Please keep praying for us, that we will make wise decisions regarding the use of our resources- time, money, energy- and that we will keep the hearts of the children all throughout the work.



Here is a current photo, roughly from the corner of Eddie and Park Rd. and Peachtree Ct. (taken from inside the car, because it's been so cold!)

Monday, December 21, 2009

Siding!!!!

Wow! The siding looks terrific. I am so pleased, and I think it will tie the two parts of the house together nicely. This first picture is the "Siding Guy". Yes, we do know the worker's real names, but didn't think we should post all that on the web. He is a nice young man, who seemed to enjoy his job. He took time to show Conner and Peter how his metal-fabricating machine worked.

Here is a shot of the back of the house. Notice the white trim line halfway up the addition. This will continue across to the existing house as the guttering and fascia. The idea is to change the proportions of the two structures. Instead of a little box and a big box... we hope the eye sees one long first floor with a second story on part of it. I think this visual trick is working. It will be easier to tell when it is all covered. Here is a view showing the wood frame addition, the existing brick house, and the new siding going on. Oh, one last thing, the color is exactly what we hoped for... nothing to draw attention to itself, but to blend into the shady landscaping. But not too boring, with the crisp white trim.

Friday, December 18, 2009

Trucks

Here we are at the end of the work week, and there are men from so many trades all going at it simultaneously. We have on-site electricians, plumbers, HVAC, carpenters, delivery men, siding guys, and well drillers (for geothermal holes). Here is a smattering of photos to illustrate this fact- through TRUCKS!

Our siding was delivered today!!!

The truck says it all:


This is a carpenter's truck. It serves as one LARGE tool box.

This is the well-drilling rig. Next week I will show it to you in action. Note: all those long pipes on top will be screwed together and lowered into the ground, deeper and deeper as the end tip drills into the earth.
(As it was lunchtime, some of the other trucks were gone when I took these photos.)

Tuesday, December 15, 2009

Now *that's* a drill!

Look at the length of this drill! It is used to drill holes in the studs for electrical wires to be ran through. The worker has good leverage, and the end of the drill is angled to get between the studs and still make a straight hole.
Here is the wiring that has been ran so far above our heads on the first floor. Notice that it is going through holes that were drilled through the floor joists. That is a lot of drilling, but much easier now than after the house is finished.




The children and I have spent 10 hours yesterday and today going from place to place "shopping" for bathroom fixtures (toilets, faucets, vanities, sinks) and lighting. By "shopping" I mean that we go to the stores and take a gazillion photos of what we think Daddy might like, along with the price tags. Then at night we sort through them all, trying to come to some decisions. We are getting down to the wire to make these decisions. After the plumbing and electrical are roughed in, then come the drywallers. When they finish, the plumbers and electricians come back to put in all the stuff we've picked out. It is our responsibility to get all that stuff bought and to the job site. This is because there is so much variability on costs and personal taste for those types of items. We are really trying to reign in the expenses in these areas, and yet have something that comes together nicely. It's funny, but the items that seem "standard" can really be expensive right now. It think it's because there is a trend toward classic looks right now. Anyway, we ended up choosing to go with pedestal sinks for the upstairs bathroom. Since we are putting in two sinks, the corresponding furniture cabinet would have been more than we wanted to spend. In the end, I think it will be easier for 4 or 5 people to use the 2 sinks this way, because they can stand around the sides of the sinks, without a countertop between the two.



More rambling thoughts now... please pray for us to make wise decisions here at the end of this process. We have been praying for this all along, but it seems like the decisions are coming fast and furious, and we want to show good stewardship over this gift we have been given.

Saturday, December 12, 2009

The electricians were here, too!

The electricians were working on the second story wiring on Friday! Chad and I met with the lead man on Thursday, to go over our lighting and wiring plan with him. What you can see in this photo is the recessed lighting that will be in the school room. This circuit of recessed lights will be in addition to a regular fixture. We are doing this (a combination of recessed and a ceiling fixture) to ensure that there is plenty of lighting in the three major public areas (school room, living room, dining room).

Here is a shot of an outlet box in one of the bedrooms. It's neat to notice the details of the installation that each of the trades do. Notice that there is drilling (through the 2x4s), stapling of the wire to the studs, extra slack given into the wire (in case changes are made in the future that may take up extra inches of wire), and marking of the location with a sharpie on the 2x4 stud.

In fact, we discovered that not only are the positions written on the studs, but the function of each switch is also noted. In this photo of the bathroom, you can see how there will be a switch for 2 ceiling lights and a switch for the exhaust fan. However, notice what the electrician referred to the fan as---
"Fart Fan" We were cracking up!!!!!!!

Windows, windows everywhere!

What a difference windows make to the look of a place. It seems even more like a home now, than a construction site, though it is still very much that.
Here is one of the boys' bedrooms, the one that faces Grant's Farm. The two windows in front are double hung windows. We used these type on all the front and rear facing windows. On the side, however, is a casement type window. This one cranks open, thus making the opening a large one. This is per code. There are size requirements in Saint Louis County regarding the minimum size of a second way of escape from a bedroom in case of fire (the first way of escape being the door). I think this room has a great view!

This photo shows the back side of the house. On all but the upper left one, you can see 2x4 frames around each window group. These will be covered with white trim, to give what I call a "beefy" look. We are not using shutters, or other ornamentation, so this trim needed to be stronger than it otherwise would have been. Notice that there is also a door installed. All three doors are in now, in fact. (Front, back, and side.) I asked Duncan to pretend to ring the doorbell. Notice the side window which allows us to see who is at the door? This view is visible from the kitchen and living room areas.