Walls up on the first floor

We are confirming it to be true that the more walls go up, the bigger the space becomes. This is because in a large empty room, it is hard to judge accurately the size of the space. When a wall is there, we have a human-sized reference point that helps us to see the space. We can then judge what types of furniture and such will fit in a room and where the "people-sized" spaces are.

Here Duncan is standing in the powder room, otherwise known as the half bath. This is a very small space, but with the walls there, you can see that it is adequately sized for a sink and potty.

Located in the dining room, there will be an alcove specially sized for our piano. Above the piano, there is an opening in the wall 4 feet wide by 3 feet tall. As you stand in the dining room, the room you look into is the one that we're calling the den or guest room. We have this room available for guests to stay in and for t.v. viewing or computer usage. However, we wanted it to be visually connected with the other public areas, thus the wall opening. Here are my two monkeys climbing on the wall framing. I told them to get it out of their systems now, because when that's actually a wall, they won't be climbing through!

By the way, the concrete floors have been covered with a heavy plastic to protect them during the rest of the construction. I can't wait to see them when they are all done!

Thursday, December 10, 2009

Still working in the freezing cold!

Just a quick note to acknowledge that the men are still working away on the house, in spite of the freezing cold weather. It is about 20 degrees here in Saint Louis. If the doors and windows go in today or Friday, that should help the situation immensely. However, right now they are using plastic sheeting to cover the openings. Some of it did not hold up to the 50 mile an hour winds we had yesterday. Also, the men have a heater that keeps the area right around where they are working somewhat warm.

Two of the men were laughing about how Mr. Williams answer to the cold is "Work faster, you'll stay warm!" That sounds just like something he would say. GRIN!

Monday, December 7, 2009

Progress on plumbing and archway

Some progress was made today on the plumbing. These pipes carry waste water away from the upstairs showers and sinks.

If you look on the floorplan drawing from a few days ago, you can see that there is an opening between the new dining room and the existing house's library. To get this opening there, an archway has been cut in what used to be the exterior brick wall of the house. Here is a before picture, you can see the cut lines in the brick on each side.
Here is an after photo, showing the archway. The opening is covered in plastic to keep some of the cold weather out of the existing house.

Thursday, December 3, 2009

Exterior work continuing

You can see in these photos how the bushes that lined the front of the house have been removed. We hope to landscape with plantings that look somewhat softer than those did.

The existing house will be sided the same as the new addition, for a cohesive look. To hang siding on brick, you must first attach strips of wood to the brick. Then the siding attaches to those strips. Also in this photo, you can see how the windows are in the process of being replaced with new thermal windows. The picture window which was in the former living room will be replaced with 3 windows of uniform size. That room will be our library, the windows making a window seat for cozy reading.

Interior concrete floor

We've learned by now that you have to get up early in the morning to see all the work getting done! By the time we got there around noon today, the concrete had already been poured and was mostly troweled smooth. Zoe did catch some of the troweling on camera, and that's what you will be seeing here.

Zoe is filming from the vantage point of inside the original house in the kitchen. She is looking through the existing window, which used to look out to the yard. This will soon be an opening in the wall between the kitchen and the living room.

Notice in the video how the workman is kneeling on boards that he then lifts and places in another position and continues working. The area of the house that is being done here is the mudroom and the doorway that goes to the side of the house (future garage?). You can see that he doesn't get backed into a corner, but instead works his way to an opening that he simply steps out of. At the end of the video you can see an overview of the entire first floor. By the way, the concrete is not its usual color, but is colored tan. We chose this to be a neutral flooring color, similar in tone to what a wood floor would look like.


Wednesday, December 2, 2009

A SECRET PASSAGE!!!

I know I didn't show a drawing of the second story floor plan, so I'll try to describe a bit of it to you. In the front of the house there are two bedrooms for our boys to share. You can see their windows in some of the previous exterior photos. These two rooms each have a closet, and these 2 closets adjoin each other end-to-end. The special thing we came up with as a surprise for the boys was to make a "secret passage" between the closets! A few days ago, one of the carpenters said to me, "What's with the hole in the closet?" I told him what it was, so when Peter and I went upstairs today, the carpenter said, "Hey, Buddy! You're secret passage is in!" I had failed to mention that it was a SURPRISE secret passage. Anyway, they boys all know about it now, and they were THRILLED with the idea! Here is Peter crawling through the secret passage.

Big machine work

Mr. Williams likes to get good use out of his big machines! So when he had the excavator out again to grade the interior gravel, he obliged us by removing several trees. Three of them were out along Eddie and Park Rd. They were best described as scraggly and homely. A professional tree removal service probably would have climbed up, cut down branches, and then either left a stump, or routed it out. However, when you have an excavator, you just knock it over!

The reason the excavator was on-site was to smooth out the gravel that is going to be underneath the concrete floor of the first floor of the addition. Previous to today, all this rock was just piled all in there. The plumbers dug out trenches in it to place their pipes, so all that type of stuff will be underneath the floor. Here is a photo of Peter showing how smoothed out the gravel is.


The light blue area along the perimiter of the room is a foam insulation. This is to help keep the cold from seeping up through the floor so much. The plan is to pour the concrete floor on Thursday and put in the walls on Friday. If all that happens, I'll be sure to show you!