Thursday, March 18, 2010

What's new? Concrete walkways!

Sorry for the long delay since the last blog post. Mostly, the work on the house has been cleaning type jobs. How many times can you see the floor being swept and mopped? grin!

But today, there was more construction work! Exciting! We got to be there as the concrete workers were adding concrete walkways to the main door off of the driveway. Unfortunately, there was a mix-up in the plan last week, and the walks weren't quite what we were expecting, so today, the crew came to add to what had already been installed. It turned out to be very satisfactory. In the photos, you can see some concrete is dried already (lighter in color) and the new stuff from today is still wet-ish (darker in color).


I'll start at the beginning of the work that was done today. First, the forms are built in the shape of the ramp and stairs and such. These are made out of 2x4s and 2x6s and are nailed into place.


Next, some plastic and gravel was put in place over the existing concrete. This is to provide a moisture barrier and to build up the ground and provide drainage. Here are the children on the gravel pile!


From inside the mudroom, the children had a great view of the work as it was being done. It was neat to see how everything came together.

The concrete truck has arrived! Now for the good part!


As soon as the concrete came down the chute, the men were working to shovel and trowel it into place. The concrete is very rocky, and you wonder as it is being poured just how it will ever look smooth and neat.

Within a few minutes, they have smoothed it once with a wooden board, then with this metal tool:
Then, for the final smoothing, the worker is on his hands and knees. He is able to kneel on the concrete as this photo shows.

He uses various trowels and other tools to smooth the concrete and put grooves in it. Also, some swirly patterns are put into place, which you can see here on the flat portion just outside our back door.


And, finally, here it is!!! Everywhere you see gravel currently will one day be grassy yard. Therefore, as you step off of the yard, you will first get to the hexagon-shaped step. Then up two steps and you are at the level of the threshold of the door. Alternatively, if you were to drive up alongside the left of the house, and need wheelchair accessibility, you can use the ramp. It is hard from this photo to tell the heights of all this concrete, but the ramp will one day start at ground level (after more dirt is added) and will lead to the back door.

Friday, February 19, 2010

Checking on the house today

This is the bench seat in the mudroom that the carpenter built today! Underneath, we will keep shoe bins and there will be coat hooks on the wall above.
The boys couldn't resist pretending to use the upstairs bathroom, now that the fixtures are in place. Peter is over on the potty, while Duncan and Conner wash their hands at the pedastal sinks. The vinyl flooring was installed by Chad and I on Monday. We think it turned out pretty nice, and looks good with the bright blue walls. There will be shower doors and shelving added soon.

On our way back home, we stopped by to take photos of the clydesdale horses which make their home just down the hill from Pipkin Place. Lovely.

What have we been up to?

Here are some odds-n-ends photos of the family working away over the last couple of weeks.
Linus is attempting to screw the extension pole onto the roller frame, as he saw other people do.


We attempted to keep everyone busy, even if it wasn't painting. Here, Conner is working on some school work. Don't you just love homeschooling?

Grandma Rexie came to help us out! She painted lots and lots of trim, and then came back on the weekend and painted walls, as well.

We were so excited to remove the plastic sheeting that had covered the concrete floors since the day after they were poured. What does the floor look like, we all wanted to know?! Here Chad is rolling up and disposing of the plastic.

Here is what we found underneath the plastic.... lots and lots of dust and construction debris. What a mess.

Hard working Zoe is going to town getting that floor clean.

Grandma Marge and Duncan were working as a team to sweep away the dust.


And here is Peter using a wet cloth to clean the floor even more. It sure looks different when it is wet than it does when dry!

To be honest, we don't know what the floor is going to end up looking like! We'd like to think that we will be putting some kind of shine on it, but we don't know what that process will turn out to be. Right now, all we know is that we will keep sweeping and mopping it every time we are over there until it finally gets clean!

Wednesday, February 3, 2010

Painting the bathroom

Today, our happy helpers Duncan and Peter painted the upstairs bathroom! Over the weekend it had received a coat or two of white paint, but today it became blue instead. The color is nice and bright and will contrast well with the white sinks, toilet, and showers. In fact, it looks smurfy!

Here you can see two minutes of Duncan and Peter painting away. They did such a good job and took the work seriously. Thanks, boys!

Tuesday, February 2, 2010

Painting Day

On Saturday, we began painting! Grandma Marge had Duncan and Peter with her over the weekend, so it was Chad, Jenn, Zoe, Conner, and Linus, in addition to Uncle Matt and Bart who came to help. We could not have done it without all their help! Unfortunately, we didn't catch Bart on film, but here's the rest of us in various stages of painting glory! GRIN!








Thursday, January 28, 2010

Our happy helpers

Today's blog is just a chance to say how thankful I am for my precious children. They all worked very hard at the house, doing what were not fun jobs. Mostly, we were sweeping, mopping, and vaccuuming up drywall dust and other debris.... for about 7 hours.

Let's start off with sweetheart helper Zoe. Here she is happily mopping her future bedroom. I think you'll be able to tell how layered the floor is with dust. She had already swept the room before mopping!



Up next is diligent Duncan, using the shop vac to get into the cracks. He is a focused worker when he gets started on a job. He really did good work!


Linus also helped by sweeping the floor, but the photo I chose of him is just because he's cute!


And now for Peter. He stayed busy helping nearly the entire day. One thing we appreciate about Peter is that he finds work to do without being asked, or he asks what he can do to help. Here he is getting the dust off the window sills.


Conner was a good helper, also. He made many trips to the trash, in addition to setting up any supplies we needed. He can be trusted to go get a variety of items and take them here or there throughout the work site. Near the end of the day, Conner took a break and listened to Sugar Creek Gang CDs that he brought with him. You know he had been working hard if Conner is on the floor to lay down in the middle of the day!

Thank you, Children! You are a blessing from the Lord.

It's our turn!

Wow, we just realized that we had the order of things wrong, and we are going to be doing the painting NOW, and then the guys will come back to finish the fixtures, outlets, toilets, trim, etc.

So, yesterday we bought 30 gallons of paint!!! It is all white and can be used as a primer and a top coat. So when the ceilings are done, they're done. And any other rooms and hallways can stay white with this as primer until we want to come back and paint any particular rooms a color.

The children and I are heading over today to get rid of as much dust as possible, equipped with shop vacs and brooms. Please pray for us as we get into full gear to get this work accomplished. If we can get in a full day of painting this weekend, that would be great.


Now I can't make a post without including a photo, so here's a shot of the outside of the house as you come up Eddie and Park Rd. from Gravois. The yard is a wreck, but will look better with some landscaping and grass later on. I think the house looks pretty unified between old and new. What a blessing!

Saturday, January 23, 2010

Getting crafty

Here's a diversion for you. Not only have the construction workers been busy, but the Quinns have been doing a bit of preparation for the new house as well!


Zoe has purchased fabric for her bedroom window curtains. She began sewing them tonight. Her color scheme is "citrus", as she calls it, with an emphasis on lemon and pink grapefruit. She has chosen a pale yellow for her wall paint and the curtain fabric is mostly pink grapefruit. Because a local fabric store is going out of business, she was able to buy some really fun trimmings to edge the curtain panels. (75% off made it affordable) She also has some decorative pillows in the works.





Jennifer's craft project has been a light fixture for the dining room. I would like a super fun look for the fixture and love funky modern ones, especially ones by Le Klint. However, there's no way the price tags were in range. So, I came across a do-it-yourself idea that I thought was worth a try. Don't think I'm crazy (well, you might already!), but the shade is being made out of drinking straws. Here's how it's done:

I took apart an old beat up lamp shade from my basement to harvest the top ring that has the center circle and three arms that go out to the outer ring. To this top outer ring, I attached hardware screen (similar to chicken wire), and tied it on with wire. And now for the fun part! Working from the inside of the wire cylinder, I am inserting a folded drinking straw onto every cross-piece of the screen. This has proven to be somewhat tedious, but I think the look will be worth it.

I bought the straws from Sam's at $10 for 3000. When completed, this shade will be attached to $15 worth of parts purchased from IKEA and Lowe's, and will hang as a pendant lamp over the dining room table. The wire form of the shade is 15 inches tall, and here is how it looks with about 2 inches of the wire filled in with straws.


I'll be sure to show you when we are all finished with these projects, but it may be awhile!

Thursday, January 21, 2010

Taping and Mudding

Well, that title probably doesn't sound too exciting, but actually the taping and mudding has been pretty exciting to see. We have been astounded to see the workmanship of the two men doing the work. The speed at which they apply the drywall tape is amazing. It really does help to have the right tools for the job! We didn't get any pictures or videos of that part, but we went back today and saw the application of some of the "mud". Zoe videoed this, so you can see how they walk around on stilts to be able to reach the higher parts of the walls and the ceilings. Poor guys had to duck underneath all our soffits continuously, while walking on stilts! Also, our boys got to help prepare a new batch of mud, and that was fun. Enjoy watching!


Video one is covering nail holes with mud. In two swipes of the putty knife, he covers 3 nail holes perfectly smooth!


Video two is the boys getting to help prepare a batch of mud. A drill was used to power a large paddle mixer in a bucket.


Video three is the men putting on their stilts and then working on the ceiling while walking on the stilts.

Thursday, January 14, 2010

Drywall sure changes things

The drywall was delivered! Look at this cool stack of drywall with three of our guys laying end-to-end on it just to show you how long it is!




And what a treat we got today to see the entire upstairs covered in drywall (not taped and mudded yet). Here is the school room- yippee!


And here are the boys on the stairs. This view formerly would have shown the exposed attic space. Sure looks different now.

Catching up - GEOTHERMAL!

Sorry for the delay in keeping you posted. The work that was going on the last two weeks was mostly more of the same--- more electrical, more duct work, more carpentry, more siding, etc. We were happy to be seeing it done, but it hasn't made for exciting photos or updates.


To get started, here's an updated photo from the back yard of how the siding is turning out. We are so pleased with it.



This 10th week of work has some new stuff! First, the geothermal ground loops were installed. Here's how it works: *Drill 3 holes into the front yard, 200 feet deep, about 10 feet apart. This involved the drilling rig we being lifted up vertically. In this video you will see the bit (which is a looong metal pipe, threaded on the ends) being attached to the bit already in the ground. Then they proceed to spin it and the rig pushes on the top of it as it drills into the earth. It is pretty slow going. After the length of it gets all the way down, another bit is attached to the top of it, and the process continues. For 200 feet!






Here is a nice shot of the drilling rig. Notice the additional drill bits, as I am calling them, or metal pipes, waiting for their turn to dig down.

This drilling was done on Monday. When we came by today on Thursday, the geothermal ground loops had been inserted into the holes. Then these loops/tubes are connected together, somehow, so there is only two going into the house. A trench was dug from the holes in the yard over to the house, four feet down. The geothermal tubing was then inserted into the house, through the basement wall. This photo shows a man using tar to seal this opening.



And then this man began to cover them up and fill in the hole. He also used a Bobcat, not just a shovel! If you were to see the front yard now, you would see no evidence that the geothermal ground loops are even out there, except for the fact that there are truck and bobcat tracks all across the yard!


Sunday, December 27, 2009

Week number EIGHT to begin

Well, we seem to be in the home stretch. It is amazing how quickly this project has gone. From what we can tell, it is just about time for the drywallers to cover all the interior studs, then tape and mud them. Then, the electricians and plumbers come back to put in their finishing touches. On the outside, the siding is well on its way. Then, I suppose there will be some sort of concrete sidewalks or such done around the back door. Also, the drilling and final hook-up for the geothermal heating/cooling has yet to happen. Whew! What a lot of work these fine craftsmen have done on this home.



Then, it's our turn! We plan to paint the interior and do some trim work. We will just take this at whatever pace we can maintain. Please keep praying for us, that we will make wise decisions regarding the use of our resources- time, money, energy- and that we will keep the hearts of the children all throughout the work.



Here is a current photo, roughly from the corner of Eddie and Park Rd. and Peachtree Ct. (taken from inside the car, because it's been so cold!)

Monday, December 21, 2009

Siding!!!!

Wow! The siding looks terrific. I am so pleased, and I think it will tie the two parts of the house together nicely. This first picture is the "Siding Guy". Yes, we do know the worker's real names, but didn't think we should post all that on the web. He is a nice young man, who seemed to enjoy his job. He took time to show Conner and Peter how his metal-fabricating machine worked.

Here is a shot of the back of the house. Notice the white trim line halfway up the addition. This will continue across to the existing house as the guttering and fascia. The idea is to change the proportions of the two structures. Instead of a little box and a big box... we hope the eye sees one long first floor with a second story on part of it. I think this visual trick is working. It will be easier to tell when it is all covered. Here is a view showing the wood frame addition, the existing brick house, and the new siding going on. Oh, one last thing, the color is exactly what we hoped for... nothing to draw attention to itself, but to blend into the shady landscaping. But not too boring, with the crisp white trim.

Friday, December 18, 2009

Trucks

Here we are at the end of the work week, and there are men from so many trades all going at it simultaneously. We have on-site electricians, plumbers, HVAC, carpenters, delivery men, siding guys, and well drillers (for geothermal holes). Here is a smattering of photos to illustrate this fact- through TRUCKS!

Our siding was delivered today!!!

The truck says it all:


This is a carpenter's truck. It serves as one LARGE tool box.

This is the well-drilling rig. Next week I will show it to you in action. Note: all those long pipes on top will be screwed together and lowered into the ground, deeper and deeper as the end tip drills into the earth.
(As it was lunchtime, some of the other trucks were gone when I took these photos.)

Tuesday, December 15, 2009

Now *that's* a drill!

Look at the length of this drill! It is used to drill holes in the studs for electrical wires to be ran through. The worker has good leverage, and the end of the drill is angled to get between the studs and still make a straight hole.
Here is the wiring that has been ran so far above our heads on the first floor. Notice that it is going through holes that were drilled through the floor joists. That is a lot of drilling, but much easier now than after the house is finished.




The children and I have spent 10 hours yesterday and today going from place to place "shopping" for bathroom fixtures (toilets, faucets, vanities, sinks) and lighting. By "shopping" I mean that we go to the stores and take a gazillion photos of what we think Daddy might like, along with the price tags. Then at night we sort through them all, trying to come to some decisions. We are getting down to the wire to make these decisions. After the plumbing and electrical are roughed in, then come the drywallers. When they finish, the plumbers and electricians come back to put in all the stuff we've picked out. It is our responsibility to get all that stuff bought and to the job site. This is because there is so much variability on costs and personal taste for those types of items. We are really trying to reign in the expenses in these areas, and yet have something that comes together nicely. It's funny, but the items that seem "standard" can really be expensive right now. It think it's because there is a trend toward classic looks right now. Anyway, we ended up choosing to go with pedestal sinks for the upstairs bathroom. Since we are putting in two sinks, the corresponding furniture cabinet would have been more than we wanted to spend. In the end, I think it will be easier for 4 or 5 people to use the 2 sinks this way, because they can stand around the sides of the sinks, without a countertop between the two.



More rambling thoughts now... please pray for us to make wise decisions here at the end of this process. We have been praying for this all along, but it seems like the decisions are coming fast and furious, and we want to show good stewardship over this gift we have been given.

Saturday, December 12, 2009

The electricians were here, too!

The electricians were working on the second story wiring on Friday! Chad and I met with the lead man on Thursday, to go over our lighting and wiring plan with him. What you can see in this photo is the recessed lighting that will be in the school room. This circuit of recessed lights will be in addition to a regular fixture. We are doing this (a combination of recessed and a ceiling fixture) to ensure that there is plenty of lighting in the three major public areas (school room, living room, dining room).

Here is a shot of an outlet box in one of the bedrooms. It's neat to notice the details of the installation that each of the trades do. Notice that there is drilling (through the 2x4s), stapling of the wire to the studs, extra slack given into the wire (in case changes are made in the future that may take up extra inches of wire), and marking of the location with a sharpie on the 2x4 stud.

In fact, we discovered that not only are the positions written on the studs, but the function of each switch is also noted. In this photo of the bathroom, you can see how there will be a switch for 2 ceiling lights and a switch for the exhaust fan. However, notice what the electrician referred to the fan as---
"Fart Fan" We were cracking up!!!!!!!